Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SOUTH FURNACE: PROVIDE 4" DBL WALL VENT THRU ROOF TO 3' ABOVE TOP OF COOLER INTAKE WITH 4" APPROVED VENT CAP 2) CAP OLD GAS PIPING INSIDE BLDG 3) PROVIDE BONDING OF BLDG GAS SYSTEM 4) PROVIDE RIDGID PIPE FOR TEMPERATURE AND PRESSURE RELIEF DRAIN WITH 1" AIR GAP AND TIGHTEN UNION (NO FLEX FOR WATER HEATER AND T & P DRAIN) 5) SEAL 2" PIPE PENETRATION INTO EXTERIOR SOFFIT (FOR BUG PROOF) 6) SEAL ROOF FLASHING TO DBL WALL VENTING WEATHER TIGHT 7) CLAMP 2" PIPE TO BLOCK ON ROOF AND SECURE ALL PIPING IN ATTIC |