Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T10PL00688
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/14/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/13/2010 | PLUMBING - FINAL | Cancelled | CANCELLED PER ROMAN #304-1118 | |
| 07/13/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) CANCELLED |
|
| 07/08/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) D-3 VENTING TO BE PROPERLY INSTALLED WITH MINIMUM 6" CLEARANCE FOR SINGLE WALL PIPING FROM COMBUSTIBLES, 1" CLEARANCE FOR DBL WALL VENT PIPING GOING UPHILL TO POINT OF TERMINATION 2) D-6 GAS VALVE TO BE APPROVED TYPE, FLEX CANNOT PASS THRU WEATHER PROOF ENCLOSURE. PROVIDE WEATHER SEAL ON VENT THRU ENCLOSURE 3) A6-WATER HEATER RELOCATED-PROVIDE TEST ON GAS PIPING. VALVES TO BE BEFORE FLEXES. PROVIDE APPROVED BASE FOR WATER HEATER 4) A3 SEE NOTES ABOVE FROM 6/30/10 INSPECTION 5) A5 WATER HEATER IS RELOCATED TO EXTERIOR, SUPPORT ALL AND SECURE ALL PIPING 6) PROVIDE TEST ON GAS SHUT OFF VALVES 7) GAS FLEX CANNOT BE USED AS PIPING AND CANNOT PASS THRU BLDG SIDE WALL 8) INSPECTOR SMELLED GAS AND JOHN MCCLURE SHUT OFF GAS TO WATER HEATER 9) SECURE WEATHER PROOF ENCLSOURE |
|
| 06/30/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ALL UNITS REQUIRE PROOF OF FUNCTIONAL T & P VALVE 2) A3-PROVIDE APPROVED VENT CAP 3) A5 WATER HEATER IS NOT APPROVED FOR USE IN MOBILE HOME 4) A6 FLOOR FOR BASE OF WATER HEATER REQUIRES REINFORCEMENT. WATER HEATER IS NOT FUNCTIONAL AND NEEDS REPLACEMENT-CORRECTLY 5) B5 REQUIRES APPROVED TERMINATE AND PRESSURE RELIEF DRAIN PIPING TERMINATING DOWN 6" TO 24" FROM GRADE 6) PROVIDE DBL WALL VENT PIPE TO POINT OF TERMINATION AT APPROVED VENT CAP 7) PROVIDE A FUNCTIONAL T & P RELIEF VALVE 8) P3 PROVIDE FUNCTIONAL T & P VALVE 9) P6 PROVIDE ACCESSIBLE GAS SHUT OFF VALVE. VENT PIPING TO BE IN CORRECT DIRECTION OF FLOW LISTING WITH APPROVED VENT CAP 10) WATER PIPING TO BE APPROVED PIPING 11) VENT TO BE CONNECTED TO DRAFT HOOD AND DRAFT HOOD TO BE IN CORRECT LOCATION |