Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2010 | PLUMBING - FINAL | Approved | ||
| 03/31/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) MAKE PIPE PENETRATIONS SEALED INTO BLDG 2) PROVIDE WEATHER SEAL FOR ROOF JACKS 3) PROVIDE BONDING OF BLDG GAS PIPING 4) PROVIDE CORRECT VENTING OF WATER HEATER/FURNACE WITH 3 FASTENERS AT EACH JOINT OF VENT PIPING (NO TAPE) 5) SECURE GAS PIPING IN WATER HEATER/FURNACE CLOSET |