Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 04/16/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE RIDGID PIPING, GRAVITY DRAIN TO INDIRECT RECEPTOR WITH 1" AIR GAP FOR BOTH REGENERATION DRAIN AND OVERFLOW DRAIN (SEPERATE DRAINS) |