Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/10/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CORRECTIONS HAVE NOT BEEN MADE |
|
| 03/09/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 15 PSI TEST-LEFT GAS TAG 2) EXTEND WATER HEATER AND FURNACE VENTS MINIMUM 3' ABOVE EVAP COOLER INTAKE 3) USE DBL WALL VENT PIPE 4) FINISH CLAMPING GAS LINE TO BLOCKS ON ROOF 5) PROVIDE A SEDIMENT TRAP IN THE GAS LINE AT FURNACE AND WATER HEATER 6) RECALL FOR FINAL INSPECTION |