Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 03/04/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE PROOF OF INSPECTION OF NEW A/C FURNACE UNIT WITH APPROVAL FROM INSPECTOR (THERE ARE MANY CORRECTIONS) 2) WATER HEATER CAN ONLY USE (1) DRAFT HOOD AND VENT NEEDS TO BE PROPERLY ATTACHED NOTE: USE ? INSTALLED DRAFT HOOD FOR THIS WATER HEATER 3) TEMPERATURE AND PRESSURE RELIEF DRAIN SHALL TERMINATE AT 90 DEGREE DOWN ON EXTERIOR 4) PROVIDE SUPPORTS FOR ALL PIPING (NO PLUMBERS TAPE) 5) PROVIDE BONDING OF BLDG GAS PIPING SYSTEM 6) PROVIDE SEDIMENT TRAP AT BOTH APPLIANCES AT GAS ENTRY 7) CALL IN BOTH PERMITS FOR INSPECTION ON SAME DAY |