Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2010 | PLUMBING - GAS PRESS TEST FNL | Approved | IVRS - Inspection :* 1) INSPECTION DONE AT 10 E KING ST. THERE IS NO 11 2) PIPE SUPPORT NEEDED AT WATER HEATER SOV AND FURNACE SOV 3) CHECK T & P VALVE FOR PROPER OPERATION AND REPLACE IF NEEDED 4) BOND TO ELECTRICAL GROUND WIRE 5) NOTE: NEW HB ON WATER PIPING REQUIRES VACUUM BREAKERS |