Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/28/2010 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CORRECT PIPE SIZING AT UNINSPECTED PIPING ON ROOF FOR STOVE AND FURNACE BRANCH, ALSO REMOVING 1/2 RESTRICTION 2) INSTALL A FLASHING AT ROOF PENETRATION TO STOVE 3) CLAMPS ON CSST UNDER STOVE 4) SUPPORT ALL ROOF TOP PIPING MININUM 1 1/2" ABOVE ROOF 5) PROVIDE A WATER HEATER DRAIN PAN 6) PROVIDE APPROVED T & P DRAIN TERMINATION 7) SECURE/SUPPORT PIPING AT POOL HEATER 8) PROVIDE INSPECTION HISTORY OR A PERMIT FOR NEW ROOF TOP UNIT |