Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 02/08/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE T & P PIPING FOR WATER HEATR 2) UNDERGROUND TEST OK 3) GAS PIPING FROM VALVE AT MOBILE TO UNDER MOBILE HOME LEAKING-REPAIR ALL LEAKS AND CALL BACK FOR FINAL |
|
| 02/03/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PSI TEST NOT HOLDING-REPAIR ALL LEAKS BEFORE CALLING FOR INSPECTION AND COMPLETE ALL OF THE LIST FROM PASS INSPECTIONS |
|
| 02/01/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE MOBILE HOME GAS FLEX AT TIE IN 2) PROVIDE TEST ON ALL GAS PIPING 10-PSI UP TO MOBILE-TESTED 3 PSI ON MOBILE 3) PROVIDE GAS PIPING PRIMER AND TAPE ON ALL BLACK IRON PIPING 4) PROVIDE APPROVED COUPLING 5) PIPING FOR T&P FULL SIZE 6) COMPLETE PAN DRAIN IN HALLS |
|
| 01/26/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) COMPLETE PIPING FOR T & P WATER HEATER AND PAN 2) PROVIDE COMBUSTION AIR FOR WATER HEATER ROOM 3) TEST NOT HOLDING-REPAIR ALL LEAKS 4) PROVIDE TEST ON ALL GAS PIPING |
|
| 01/21/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE MINIMUM OF 10 PSI TEST ON ALL GAS PIPING, GAUGE SHALL HAVE 1/10 PSI INCREMENTATION 2) RUN T & P FOR WATER HEATER TO DAYLIGHT WITH CPVC, GALV, OR COPPER PIPING 3) PROVIDE SOLID FLOORING FOR WATER HEATER AND PAN OR SHEET METAL |