Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 03/30/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE APPROVED COUPLING ON UNDERGROUND PIPING 2) PROVIDE ROOF JACKS FOR GAS PIPING GOING THRU ROOF 3) PROVIDE SUPPORT ON ALL GAS PIPING MINIMUM ON 1 1/2 ON ROOF 4) PROVIDE NEW PSI TEST |
|
| 03/08/2010 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) GAS PIPING MAY NOT RUN BELOW SLAB 2) UNIONS MAY NOT BE CONNECTED 3) CHECK SIZING OR PROVIDE FULL SIZE TEE AND 3/4" PIPING TO FURNACE 4) PROVIDE ELECTRICAL BONDING 5) PROVIDE CLEARANCE AROUND B VENT 6) PROVIDE PROPER CONNECTION AT WATER HEATER DRAFT COLLAR 7) B VENT IS REQUIRED TO TERMINATE ABOVE COOLER |
|
| 02/23/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE APPROVED PIPING TO FURNACE ROOM 2) CANNOT RUN FLEX UNDER HALLWAY FLOOR 3) PROVIDE VEW PSI TEST 4) LIST MAY NOT BE COMPLETE |
|
| 01/14/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) TEST NOT HOLDING, PROVIDE MINIMUM 10 PSI TEST 2) NO ONE AT HOME AND GATE LOCKED |