Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/26/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) UNOCCUPIED STRUCTURE 2) PROVIDE DBL WALL VENT PIPING THRU ROOF OF WATER HEATER ENCLOSURE WITH MINIMUM 1" CLEARANCE FROM COMBUSTIBLES AT ROOF LEVEL (WOOD) |
|
| 01/20/2010 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE DBL WALL VENT PIPING THRU ROOF OF WATER HEATER ENCLOSURE WITH MINIMUM 1" CLEARANCE FROM COMBUSTIBLES 2) PROVIDE 90 DEGREE DOWN ON T & P DRAIN FROM WATER HEATER 3) BONDING MAYBE REQUIRED OF GAS SYSTEM 4) LIST MAY NOT COMPLETE |