Permit: T10PL00006

Parcel: 110053290

Inspection Status: Not ready for Inspection

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
01/07/2010 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) REQUIRE A TEN POUND TEST ON THE SYSTEM (YOU HAVE 3 POUNDS). SYSTEM IS TO BE PRESSURIZED WHEN THE INSPECTOR ARRIVES. I CALLED STEVE AND GAVE A 30 MINUTE NOTICE
2) CONTINUED NOT READYS WILL RESULT IN A REINSPECTION FEE
3) I NOTICED THAT THE POINT OF CONNECTION TO EXISTING IS A TEE. THE TEE FEEDS THE WATER HEATER, AND IS NOT INCLUDED ON YOUR PLAN.
4) PIPING IS UNDERSIZED
5) WATER HEATER DOES NOT MEET CODE
6) REVISE YOUR PLAN, UPSIZE YOUR PIPE AND MAKE CORRECTIONS AT WATER HEATER
01/06/2010 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
1) NOT INSTALLED PER PLAN, PLAN CALLS FOR 3/4" BLK IRON PIPE MAY NOT BE INSTALLED UNDERGROUND-USE SCOTCHCOAT
2) GAS PIPING REQUIRES A MINIMUM OF 12" OF COVER