Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T10PL00005
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Denied
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/22/2010 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) TEST TO HOLD MINIMUM 10 PSI WITH NO LOSS OF PRESSURE FOR 15 MINUTES 2) NO UNION CAN BE INSTALLED UNDERGROUND 3) PROVIDE APPROVED GAS SHUT OFF VALVES FOR ALL APPLIANCES 4) VENT ON WATER HEATER TO BE INSTALLED CORRECTLY WITH APPROVED VENT MATERIAL TERMINATING CORRECTLY 5) WATER HEATER TEMPERATURE AND PRESSURE RELIEF TO BE FUNCTIONAL AND GRAVITY DRAIN TO DAYLIGHT WITH APPROVED PIPING (NO FLEX) TERMINATING AT 90 DEGREE DOWN ON EXTERIOR 6" TO 24" FROM FINISH GRADE 6) GAS PIPING IN A WOOD BURNING FIREPLACE SHALL BE VALUED ON EXTERIOR OF HEARTH IN SAME ROOM AS FIREPLACE WITHIN 6 FEET OF HEARTH (NO LIVE GAS PIPING INSIDE HEARTH) 7) WATER HEATER TO BE INSTALLED IN DRIP PAN ON FLOOR NOT ON WOOD BLOCKS 8) THIS IS NOT A GAS RECONNECT, PROVIDE A CITY APPROVED GAS ISOMETRIC PLAN WITH BTU, SIZE OF PIPING AND DISTANCES OF PIPE RUNS. IT APPEARS YOUR PIPING IS UNDER SIZED 9) HAVE A LADDER ON SITE TO INSPECT ALL VENT TERMINATIONS 10) PROVIDE BONDING OF GAS PIPING 11) LIST NOT COMPLETE |