Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2010 | FIRE - FINAL | Approved | ||
| 11/09/2010 | FIRE - FINAL | Denied | 1. Front door requires sign: "THIS DOOR TO REMAIN OPEN WHEN BUILDING IS OCCUPIED". 2. Rear door requires a thumb turn dead bolt. Key lock not permitted. 3. Service/repair two (2) exit signs. |