Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/09/2010 | FIRE - FINAL | Approved | Approved 11/9/10 | |
| 11/05/2010 | FIRE - FINAL | Denied | Not approved 11/5/10 1.) All permanent wiring must comply with the electrical code. a.) exposed ROMEX wiring below 7 feet ( utility room) b.) spliced wiring (utility room) c.) improper wiring ( utility room) d.) exposed ROMEX ( managers closet) 2.) Replace any missing cover plates 3.) Need a door hadle or a door knob in unit #9 4.) Bathroom door in unit #14 is hard to open. 5.) Need directional exit signs to the rear of the units if exiting is going to be allowed in that direction. 6.) Need a breaker blank int the panel in unit #6 |