Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T10OT02147
Inspection Description - FIRE - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/13/2010 | FIRE - FINAL | Approved | Approved 10/13/10 | |
| 10/06/2010 | FIRE - FINAL | Denied | Not approved 10/6/10 1.) Need approved floor plans for building. (plans not on site) 2.) Re-position all ceiling tiles back into place. 3.) Need a sign over the mai exit door(east door) that reads,"DOORMUST REMAIN UNLOCKED BUILDING IS OCCUPIED". This sign must apply for both inside door and the outside security door. 4.) Remove thumb-turn lock from the west exterior door and replace it with a thumb-turn lock. |