Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2010 | FIRE - FINAL | Approved | ||
| 10/05/2010 | FIRE - FINAL | Denied | 1. Waiting room- remove key lock on exit door. 2. Waiting room cover electrical outlet on West wall. 3.Change lock in office. 4.Break room needs electrical cover plates 5. Repair bay room remove exposed wiring. 6. 2 exit signs and 1 directional exit sign required. 7. Change lock in office 2. 8. Sprinkler deficiencies need to be corrected per sprinkler report of 3/15/2010 plus 5 year check valve test required. 9. Fire Extinguishers required. Type 2-A:20-B:C no more than 75 feet from pumps, dispensers or storage tank fill pipe opening. IFC 2205.5 |