Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2011 | FIRE - FINAL | Approved | ||
| 08/11/2010 | FIRE - FINAL | Denied | 1. Stock room wiring to light needs to be protected in conduit or installed properly in the wall. 2. Outside break room flood light shall be install properly. 3. Air lines need to be metal material can not use plastic water line for air hose supply. 4. Need site plan and floor plan on site when calling in for final C of O. |