Inspection History Details
Inspection Status: Approved
Inspection History: CERTIFICATE OF OCCUPANCY
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2010 | CERTIFICATE OF OCCUPANCY | Approved | IVRS - Inspection :* | |
| 07/26/2010 | CERTIFICATE OF OCCUPANCY | Not ready for Inspection | IVRS - Inspection :* 1) TERMINATE E BAY CEILING WIRING CORRECTLY 2) INSTALL CORRECT PLUG IN PANEL BOX IN BATHROOM AND LABEL BREAKERS IN BOTH BOXES 3) CONNECTIONS AND PLUGS ON EVAP COOLER SWITCH 4) INSTALL RESTROOM SIGNAGE 60" TO CENTER AND OUTLET NEEDS TO BE GFCI PROTECTED 5) REMOVE BROKEN GLASS FROM WINDOWS 6) NEED FIRE C OF O 7) REINSTALL GROUND WIRE 8) ADDRESS 15" LETTERS |