Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/30/2010 | FIRE - FINAL | Approved | ||
| 05/21/2010 | FIRE - FINAL | Denied | 1. Compressed gas cylinders must be secured. 2. Main exit door: Security grill key lock must be removed and replace with thumb turn dead belt. 3. Sign required on main door:THIS DOOR TO REMAIN OPEN WHILE BUILDING IS OCCUPIED 4. Rear exit drop down bars and hardware must be removed. 5. Extession cords shall not be used as permanent wiring. 6. Only approved relocatable power taps are allowed and shall be directly connected to permanent power supply. |