Inspection History Details
Inspection Status: Approved
Inspection History: CERTIFICATE OF OCCUPANCY
Permit Number - T10OT00791
Inspection Description - CERTIFICATE OF OCCUPANCY
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/06/2010 | CERTIFICATE OF OCCUPANCY | Approved | ||
04/14/2010 | CERTIFICATE OF OCCUPANCY | Not ready for Inspection | IVRS - Inspection :* 1) REPAIR CEILING AT DUCT PENETRATION (MAY BE DONE WITH SHEETROCK) 2) HEAD SINK MUST BE CAULED AT WALL AND SPRAY HEAD MUST BE PROPERLY INSTALLED WITH PRESSURE VACUUM BREAKER 3) 1 HOUR SEPERATION REQUIRED BETWEEN INCINDENTAL STORAGE IN BASEMENT AND UPPER FLOOR. PLEASE VERIFY OR INSTALL SHEETROCK AT CEILING OR SPRINKLER THE BASEMENT 4) STRUCTURAL REPAIR REQUIRED FOR DAMAGED JOISTS AT FLLOR CEILING ASSEMBLY |