Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2010 | FIRE - FINAL | Approved | Approved | |
| 03/22/2010 | FIRE - FINAL | Not ready for Inspection | 1. Sign required on front egress door: THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED. 2. Address required per Pima County Regulations. 3. Service/repair/mount portable fire extinguishers X2. 4. Remove latch bolts on two (2) doors N/W and N/E side. Replace with thumb turn dead bolt. 5. Extension cords shall not be used as permanent wiring on East side of building. 6. Clean up trash in back. 7. Repair hole in ceiling. 8. Properly store spent oil on North side of building. 9. Remove extension cords in lower work area. |