Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T10OT00584
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/31/2010 | FIRE - FINAL | Approved | Approved | |
03/22/2010 | FIRE - FINAL | Not ready for Inspection | 1. Sign required on front egress door: THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED. 2. Address required per Pima County Regulations. 3. Service/repair/mount portable fire extinguishers X2. 4. Remove latch bolts on two (2) doors N/W and N/E side. Replace with thumb turn dead bolt. 5. Extension cords shall not be used as permanent wiring on East side of building. 6. Clean up trash in back. 7. Repair hole in ceiling. 8. Properly store spent oil on North side of building. 9. Remove extension cords in lower work area. |