Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/28/2010 | FIRE - FINAL | Approved | Approved 7/28/10 | |
| 07/14/2010 | FIRE - FINAL | Denied | Not approved 7/14/10 1.) Need approved floor plans 2.) Need sign over front door reading,"DOOR MUST REMAI UNLOCKED WHEN THE BUILDING IS OCCUPIED" 3.) Portable fire extinguishers must labled 4.) Remove the double-cylinder lock from the "server" room and replace with a thumb-turn lock.(thumb-turn on egress side) 5.) Only one locking device is allowed to be used per door. Remove all extras. 6.) Remove double-cylinder lock on rear door and replace with thumb-turn lock |