Inspection History Details
Inspection Status: Approved
Inspection History: CERTIFICATE OF OCCUPANCY
Permit Number - T10OT00073
Inspection Description - CERTIFICATE OF OCCUPANCY
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/23/2010 | CERTIFICATE OF OCCUPANCY | Approved | ||
07/29/2010 | CERTIFICATE OF OCCUPANCY | Not ready for Inspection | IVRS - Inspection :* 1) PROPERLY PLUMB AND DRAIN FIXTURES IN MECH ROOM (BACKFLOW AND DRAIN CONNECTIONS) 2) WORKING CLEARANCE REQUIRED AT ELECTRIC PANEL-RELOCATE WATER HEATER 3) USE LISTED DRAIN CONNECTORS UNDER LAV 1) FLOOR PLAN NEEDS TO BE CORRECTED 2) CAULK LINE AT WALL AND WATER CLOSETS AT FLOOR 3) REPAIR WIRE AT WATER HEATER 1) 3 COLUMN FOOTINGS OK TO POUR 1) NOTE: NEW A/C UNIT TO REPLACE OLD UNIT-CHECK BEFORE FINAL 1) OK SHEETROCK 1) NEED ELECTRIC FINAL 1) OK TO SET TILES THROUGHOUT 1) OK TO SET CEILING TILES 1) GLENN ST PEDESTRIAN BRIDGE-#4 REBAR AT 6" X 12" THROUGHOUT-OK TO POUR BRIDGE SLAB 1) CLIPS AND SHEATHING IN PLACE-OK TO STUCCO 1) ENSURE VANITY LIGHT FIXTURE IS IN PLACE PER PLANS, PAGE E-1 1) BOTH WALLS 1) BOTH WALLS 1) CLIPS AND STRAPS IN PLACE; SHEAR SHEATHING IN PLACE-OK TO COVER 2) NOTE: THIS SITE IS LOT #6 NOT LOT #11 1) GRADE BEAMS #1 THRU 9; C,D,E OK TO POUR PROGRESS AREAS 1) GL-#27 & 28; DETAILS #1,6.2.1 AT 5,6.2.2 FRAMING AND ROOF NAILING-OK TO DRY IN PROGRESS AREA 1) CONTRACTOR CANCELLED 1) PHASE II TOWER PROGRESS 1) PHASE II PROGRESS 1) PHASE II WEST WALL 1) GROUT ABOVE BEAM 1) BLOCK 3 SIDES ON MECH 1) 2ND LIFT OK 1) INCOMPLETE 1) 3RD LIFT OK 1) GL 1-2/B-H 2ND & 3RD FLOOR WELDS 1) PROGRESS AREA 1) LAV IN WOMENS RESTROOM NEEDS TO BE 34" MAX IN HEIGHT PER PLAN SHEET A3.1 2) TOILET IN WOMENS RESTROOM SHALL BE 18" TO CENTER OF WATER CLOSET PER PLAN SHEET A3.1 1) INFO ONLY 1) NEED SIGNAGE AT RESTROOM 2) NEED PLUMBING FINAL AND C OF O FIRE APPROVAL PRIOR TO THIS INSPECTION 1) NEED PLUMBING FINAL |
|
07/14/2010 | CERTIFICATE OF OCCUPANCY | Not ready for Inspection | IVRS - Inspection :* |