Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2011 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 12/30/2010 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1) FLUE PIPE NOT MECHANICALLY ATTACHED TO UNIT 2) PROVIDE APPROVED CORD CONNECTORS WHERE WIRE PASSES THRU CABINET 3) PROVIDE TIGHT JOINTS ON ALL FLUE PIEP FITTINGS MINIMUM 1" INSERTION 4) ALL PVC JOINTS ARE TO BE PRIMED, PRIMER IS TO BE PURPLE IN COLOR 5) SECONDARY DRAIN TO DUMP IN A MONITORED LOCATION 6) ALL PVC EXPOSED TO EXTERIOR IS TO BE COATED 7) ALL LINE SET INSULATION EXPOSED TO EXTERIOR IS TO BE COATED 8) STRAP GAS PIPING AT UNIT 9) FLUE PIPE ON EXTERIOR OF BLDG NOT COMPLETE |