Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/16/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BEEN MADE |
|
| 11/02/2010 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1) PROVIDE GFI PROTECTED SERVICE OUTLET ON ROOF WITHIN 25' OF UNIT. DO NOT PULL POWER FROM CONDENSATE UNIT 2) PROVIDE GROUND WIRES TO CONDENSER (WHITE IS NEUTRAL, GREEN IS GROUND) 3) PROVIDE ROOF JACK ON ELECTRIC PENETRATIONS THRU ROOF 4) SEAL DUCT IN MECH ROOM INSULATE DUCT IN MECH ROOM 5) HORIZONTAL FLUE PIPE NOT TO EXCEED 60 DEGREE 6) PROVIDE SECONDARY DRAIN ON EVAP COIL. (EZ-TRAP) 7) POWER CORD TO BE MIN. 6" AWAY FROM FLUE PIPE |
|
| 10/26/2010 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE LADDER TO ACCESS ROOF 2) PROVIDE ALL REQUIRED DOCUMENTS |