Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 10/14/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. 3" |
|
| 10/06/2010 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1) REMOVE ALL FOIL TAPE FROM FLUE PIPING 2) PROVIDE A MINIMUM 3 SCREWS AT ALL FLUE PIPE JOINTS 3) PROVIDE CORRECT FLUE PIPE SIZE OR DOCUMENTATION SHOWING 3" 4) REMOVE ALL OBSTRUCTIONS FROM FRONT OF UNIT (COND. PIPING AND PUMP) 5) ALL PVC JOINTS TO HAVE PRIMER, PRIMER TO BE PURPLE IN COLOR 6) CONDENSATE NOT TO TERMINATE ON HARD SURFACE 7) ALL PIPE INSULATION EXPOSED TO DAYLIGHT TO BE COATED 8) LINE SETS NOT ANCHORED TO STRUCTURE |