Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BEEN MADE |
|
| 09/09/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) WHEN A SECONDARY OUTLET IS PROVIDED IN THE COIL, YOU MUST USE THIS OUTLET FOR THE OVERFLOW SENSOR 2) DO NOT PUT OVERFLOW SENSOR IN THE PRIMARY DRAIN LINE 3) EXTEND VENT ON PRIMARY DRAIN ABOVE DRAIN PAN IN COIL |
|
| 08/26/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE AN OVERFLOW SENSOR IN SECONDARY DRAIN OUTLET 2) USE PURPLE PRIMER ON ALL PVC FITTINGS PRIOR TO GLUE 3) 3/8" ID X 18" GAS FLEX NOT ADEQUATE FOR 100,000 BTU FURNACE 4) PROVIDE A PROTECTIVE COATING ON EXPOSED ARMAFLEX |