Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2011 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BEEN MADE |
|
| 04/29/2011 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 03/04/2011 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) YOU CANNOT USE 1 LEG FROM THE 240 VOLT AIR CONDITIONING CIRCUIT TO POWER A SERVICE RECEPT 2) YOU CANNOT USE THE GROUND BAR FROM THE DISCONNECT FOR NEUTRAL 3) PROVIDE A DEDICATED CIRCUIT FROM THE PANEL FOR THE SERVICE RECEPT 4) I.D. CIRCUIT BREAKER FOR THE CONDENSOR AND SERVICE RECEPT 5) SERVICE RECEPT BREAKER NOT TO EXCEED 20 AMP |
|
| 12/03/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSULATE SHEET METAL SLEEVE ON FAN COIL 2) MAKE UNIT DATA PLATE WITH PROPER HEAT STRIP INSTALLED 3) USE THE CORRECT FITTING AT ELECTRICAL CONNECTION TO FAN COIL 4) PROVIDE A ROOF JACK AT CONDENSATE PENETRATION THRU ROOF 5) A/C DISCONNECT OVER FUSED. ID A/C AND SERVICE RECEPT CIRCUIT BREAKERS |