Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/25/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 05/24/2010 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* 1) ITEMS 1, 3 & 4 DATED 5/21/10 STILL NEED TO BE CORRECTED |
|
| 05/21/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE ROMEX CONNECTOR WHEN ENTERING CABINET WITH WIRING 2) ALL PVC JOINTS ARE TO BE PRIMED, ALL PRIMER IS TO BE PURPLE IN COLOR 3) PROVIDE P-TRAP AND VENT AT COIL PER INSTALL INSTRUCTIONS 4) PROVIDE MEANS OF SECONDARY DRAIN 5) SEAL AND DUCT IN MECH. CLOSET 6) FLUE PIPE IS RUN BACKWARDS AT REDUCER 7) REMOVE WHITE WIRE FROM LINE VOLTAGE TO C.U. PROVIDE APPROVED COLOR CODE. PROVIDE FACE PLATE IN DISCONNECT BOX 8) PROTECT WIRING TO C.U. IN SHED |