Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* 1) CORRECTIONS HAVE BEEN MADE |
|
| 07/29/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) MARK UNIT DATA PLATES AND FUSE ACCORDINGLY 2) INCREASE CONDENSATE TO 1" AFTER 1ST TEE 3) DRY WALL IS SATURATED AND OVERFLOWING ONTO PARKING LOT 4) SUPPORT PVC ON ROOF EVERY 4' 5) A/C ON EAST SIDE IS OVERFLOWING WITH CONDENSATE WATER 6) PROVIDE THE REQUIRED GFI SERVICE RECEPT 7) PROVIDE AN OVERFLOW SENSOR IN FAN COIL MAIN DRAIN PAN |
|
| 06/01/2010 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE LADDER TO COMPLETE INSPECTION ON ROOF 2) ALL FOAM PIPE INSULATION EXPOSED TO WEATHER IS TO BE COATED |