Inspection History Details
Inspection Status: Correction Required
Inspection History: VIOL - BUILDING SVCS & SYSTEMS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2010 | VIOL - BUILDING SVCS & SYSTEMS | Correction Required | 605.4.2 Power supply Relocatable power taps shall be directly connected to a permanently installed receptacle. ____Remove daisy-chained multi-plug adapters. |
|
| 09/15/2010 | VIOL - BUILDING SVCS & SYSTEMS | Correction Required | 603.1 IFGS 407.2 Design and installation. Piping shall be supported with pipe hooks, metal pipe straps, bands, brackets, or hangers suitable for the size of piping, of adequate strength and quality, and located at intervals so as to prevent or damp out excessive vibration. Piping shall be anchored to prevent undue strains on connected equipment and shall not be supported by other piping. Pipe hangers and supports shall conform to the requirements of MSS SP-58 and shall be spaced in accordance with Section 415. Supports, hangers, and anchors shall be installed so as not to interfere with the free expansion and contraction of the piping between anchors. All parts of the supporting equipment shall be designed and installed so they will not be disengaged by movement of the supported piping. |