Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FULL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2010 | INSP - FULL | Approved | Cionducted a follow-up on the complaint and found that the appliance had the required shield between the deep fryer adn the range. The requirement is either 16 niches of space or 9 inch shield. No other action required. |
|
| 07/15/2010 | INSP - FULL | Correction Required | 96 12.1.2.4. - FRYERS SHALL BE INSTALLED WITH AT LEAST SIXTEEN INCHES OF SPACE BETWEEN THE APPLIANCE AND FLAMES OF ANOTHER |