Inspection History Details
Inspection Status: Approved
Inspection History: VIOL - BUILDING SVCS & SYSTEMS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2010 | VIOL - BUILDING SVCS & SYSTEMS | Approved | ||
| 02/24/2010 | VIOL - BUILDING SVCS & SYSTEMS | Violation | Open space in electrical panel: TFC2006 605.1 Abatement of electrical hazards. Identified electrical hazards shall be abated. _____Place an approved "blank" in the space. |
|
| 02/24/2010 | VIOL - BUILDING SVCS & SYSTEMS | Violation | Blocked electrical panel: TFC 605.3 Working space and clearance. A working space of not less than 30 inches (762 mm) in width, 36 inches (914 mm) in depth and 78 inches (1981 mm) in height shall be provided in front of electrical service equipment. ______Fix / replace door in front of electrical panel so it can be opened in an approved manner. |