Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2010 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) OK CONDUCTOR COLORS IN JUNCTION BOX |
|
| 09/01/2010 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) OK CANS IN BAR SOFFIT-OK RECEPT WIRING IN BAR 2) OK TO COVER FURR OUT AT NEW PANEL 3) MET WITH TROY WILLIAMS, JASON JAWORSKY AND MYSELF TO DISCUSS PLANS AND REVISIONS |
|
| 08/25/2010 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ELECTRIC PLANS STILL NOT REFLECTIVE OF WORK INSTALLED, ALSO SHOW NEW WORK IN BATHROOMS 2) FINISH #1, 3 AND 4 3) WILL NEED PLANS AND PERMITS FOR STRUCTUAL, PLUMBING AND MECHANICAL |
|
| 08/12/2010 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) MET WITH BOB BLIZARD THE ELECTRICIAN TO DISCUSS JOB AND POINTED OUT DISCREPENCIES TO FIX |
|
| 07/29/2010 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEW WORK FOR BAR AREA TO BE PERMITTED-WORK INSTALLED AND COVERED WITHOUT INSPECTION 2) BOND JUNCTION BOX ENCLOSURE 3) CONDUCTOR COLORS TO BE PER 210.5 OF CITY AMENDMENTS 4) PANEL 'D' HAS 15 CIRCUITS-PLANS SHOW 10 5) SUPPORT CONDUIT ABOVE PANEL AND SUB PANEL 6) FEEDER CONDUCTORS REPLACED BACK TO MAIN PANEL-MAIN PANEL MISSING DEAD FRONT COVER, PLEASE VERIFY MANUFACTURE OF MAIN PANEL TO VERIFY BREAKER LISTING OF MANUFACTURE. PLANS TO SHOW CONDUCTOR SIZE AND WILL NEED NEW PANEL LOADS |