Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Denied
Inspection History: ELECTRIC - FINAL
Permit Number - T10EL00976
Inspection Description - ELECTRIC - FINAL
Inspection Status - Denied
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/04/2010 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COMPLETE ALL ITEMS FROM PREVIOUS RECONNECT PERMIT T09EL01703 2) NEED TO PROPERLY REPAIR GROUNDING ELECTRODE SYSTEM AND REBOND ALL PIPING SYSTEMS 3) NEED TO DO THIS FOR ALL BLDGS ON COMPLEX, WILL NEED SEPERATE REPAIR PERMITS FOR OTHER BLDGS |
|
07/24/2009 | ELECTRIC - FINAL | Denied | There is no access to the site.| 920* 1) UNIT LOCKED 2) NO ACCESS 3) NO ONE IN OFFICE 4) NEED TO ADDRESS UNIT COMMENTS MADE ON T09EL01703 |
|
07/28/2001 | ELECTRIC - FINAL | Denied | See detailed listing on site.| 999* 1) NEED ADDRESS ON UNIT 2) INSTALL SMOKE DETECTORS IN BEDROOMS PER INSTRUCTIONS 3) INSTALL SMOKE DETECTOR IN HALL OUTSIDE BEDROOMS PER INSTRUCTIONS 4) NEED PANEL DIRECTORY 5) GROUNDING ELECTRODE SYSTEM CUT AND STOLEN. NEEDS TO BE REPAIRED OR REPLACED. PULL SEPERATE PERMIT FOR REPAIR COMMENTS MADE ON T09EL01703 |