Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 04/25/2011 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
MET WITH THE OWNER AND THE DRAWINS ARE STILL BEING WORK ON. THEY WILL BE SUBMITTING SOON AND HAVE BEEN IN CONTACT WITH THE OWNER WITH UPDATES. THE DRAFTMAN WILL BE CALLING ON SOME OF THE ISSUES THAT ARE BEING QUESTIONED WITH SOME OF THE CHANGES. ADVISED THE OWNER THAT ONCE THE PERMIT HAS BEEN ISSUED TO CALL FOR INSPECTION DUE TO ALL THE WORK HAS BEEN DONE. WILL CHECK IN 60 DAYS. RV. |
| 02/23/2011 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
TALK TO THE OWNER AND STILL HAVING TROUBLE WITH GETTING THE PLANS COMPLETED. HAVE BEEN IN CONTACT WITH THE OWNER BY PHONE. SHE HAS NOT APPLIED FOR THE PERMIT DUE TO NOT COMPLETED ON THE DRAWINGS ENOUGH TO SUBMIT. WILL CHECK IN 60 DAYS. RV. |
| 12/03/2010 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
MET WITH THE OWNER AND LOOKED AT ALL THE ISSUES BEING STATED DONE WITH OUT PERMITS. FOUND A NEW GAS 50 GAL. WATER HEATER, NEW HRDRO TUB INSTALLED IN THE MASTER BATHROOM AND HAS NO ACCESS TO THE MOTOR, NEW AC PACKAGE UNIT ON THE ROOF AND A GAS LINE ADDED TO UNIT, A NEW MASONRY WALL BUILT IN THE REAR OF THE PROPERTY AND HAS A RETAINNING WALL AND WALL ADDED TO THE TOP OF THE RETANNING WALL. THE RETANNING WALL IS EXPOSED 2-' TO 3' IN HEIGHT AND A 5' T0 6' WALL ON TOP OF THE RETANNING WALL, SHEDS ADDED TO THE SIDE PROPERTY LINE IN THE REAR YARD WITH AN AC IN THE WALL AND OUTLETS AND LIGHTS ON ONE, AND ANOTHER SHED ON THE REAR PROPERTY LINE NO ELECTRICAL, ADDED ELECTRICAL TO THE MAIN SERVICE PANEL TO ROOF AND BACK ROOM. WILL NEED TO CHECK RECORDS AT D.S.D., THAN WILL DO N.O.V. RV. |
| 11/30/2010 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
WENT TO SITE AND THE CARD HAS BEEN REMOVED FROM THE DOOR. LEFT A NOTE OF PAPERWORK TO MAKE CONTACT AS SOON AS POSSIBLE. WILL CHECK IN 5 DAYS. RV. |