Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T10DV06486

Parcel: 115080230


Addresses:

333 W DRACHMAN ST

Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Date Description Inspector Results Comments
09/23/2010 INSP - INITIAL CODE ENFORCMENT Approved Inspector visited site, fire had occurred in the main office next to the lobby, in front of the structure. Front office was gutted by fire, rear office had parial drywall ceiling removed and heavy smoke damage, outlets melted in the north wall. S/W Gas turned off the gas to the structure, TFD turned all power off. Electrical System is a 3Phase system TEP mentioned that becase nothing was marked at the Main Switch Board Panel, they would not get involved. Owner contacted Mehl Electrical who shut everything off, worked backwards to identify bad circuits, eventually turning power back on isolating all firedamaged circuits. Hotel had only 18 occupied units, many occupants were put up in motel next door (Frontier Motel). Owner contacted Insurance Company who hired Pinnacle Restoration to complete the board up of the structure, I went over with Don Chavez our requirements for the boarding. NOV was issued. *See additional notes in sire.