Case: T10DV05996

Parcel: 14017001A


Addresses:

1514 E IRVINGTON RD

Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Date Description Inspector Results Comments
09/13/2010 INSP - INITIAL CODE ENFORCMENT Approved 09/13/10 INITIAL INSPECTION - MET WITH CONTRACTOR ON SITE// 60 - 1 bedroom units- block construction

Exterior
- graffiti has been pressure wash off the bldg. all except for one but are working on it
- grounds have started to be cleaned up all couches in rear of bldg and all trash and debris in the center of the complex has been removed. Will be starting on weeds/grass in the front of the location.

Interior
- Have scraped the ceilings to all units of acoustic ceiling, is down to sheetrock. Some areas of ceiling have been cut out mostly on second floor where coolers leaked and damage the sheetrock.
- Complete tear down of the units has started all interior and exterior doors removed along with flooring
- Kitchen cabinets and sinks have all been removed along with sheetrock exposing plumbing in kitchens and in bathrooms.
- All copper water lines to units have been removed.
- All hot water heaters to units have been removed.
- All toilets have removed
- Electrical wiring in the plumbing wall was removed for the copper, will need to be replaced and may include switches, outlets, junction boxes and fixture boxes
- Have removed all baseboard heating to all units
- All coolers to second floor units have been removed on both north and south bldgs, was uncertain of what type of cooling system would be going in.
In Process
- Has started installing sheetrock to most of the units on the bottom floor. Doing bedrooms, hallways and living rooms, applying sheetrock to block walls.
- Will be replacing 26 windows in units and all exterior doors

Need to address
- One broken stair on north bldg
- Hand rails throughout complex are loose
- Railing to second floor balcony has openings large that 4 inches, will need to be addressed
- Exterior conduit loose, needs to be re-secured or replaced. Electrical disconnects for exterior lights need to be replaced and exterior system check for defects or lack of electrical breakers