Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
Case Number - T10DV00773
Inspection Description - INSP - FOLLOW UP CODE ENFORCE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/04/2010 | INSP - FOLLOW UP CODE ENFORCE | Approved | PERMIT FINALED ON 08/03/2010. T10CM00675. VIOLATION ABATED. CLOSE CASE. | |
07/28/2010 | INSP - FOLLOW UP CODE ENFORCE | Approved | MET OWNER AT SITE AND FOOTINGS WERE BEING DUG OUT. FOOTINGS WERE UNDER PINNING. FLOORING CUT WHERE THE FOOTINGS WERE TO BE ADDED. HE WILL BE CALLING FOR INSPECTION TO POUR CONCRETE FOR FOOTINGS. ALL OTHER CORRECTION DONE. WILL KEEP FOLLOW UP DATE. RV. | |
04/13/2010 | INSP - FOLLOW UP CODE ENFORCE | Approved | MET WITH THE OWNER ON SITE. PERMIT HAS BEEN ISSUED FOR ROOM TO SHED. FOR APPROVAL, REQUIRES STAIRWAY AND RAILING HAS TO BE REMOVED. OWNER WANTS TO KEEP STAIRS AND RAILING AND HAVE MET WITH AN ENGINEER. THEY ARE DISCUSTING OPTION ON DESIGNING ON KEEPING THE STAIRS AND RAILING. WILL CHECK IN 160 DAYS. RV | |
03/29/2010 | INSP - FOLLOW UP CODE ENFORCE | Approved | Permit has been issued, T10CM00675 on 3-23-10 and no inspection done. Have been in contact with Rick who is working on drawings and work being done to storage room. Steps and railing need to be removed to storage room only. Will check in 45 days. |