Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T10DV00728
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/03/2010 | INSP - INITIAL CODE ENFORCMENT | Approved | ON SITE INSPECTION RESULTS, PATIO AREA HAS NEW FLEX CONDUIT FROM PATIO SUPPLYING POWER TO TWO NEW JUNCTION BOXES. ONE JUNCTION BOX WITH SWITCHES IS NOT PROPERLY INSTALLED HANGING FROM THE WALL UNSECURED. SECOND J BOX HAS 4 RECEPTACLES IN SAME AREA. EXTERIOR WALL TO THE DINNING ROOM AS NEW BRICK VENEER INSTALLED TO THE EXTERIOR. 4 NEW WINDOW OPENINGS AND 1 DOOR OPENING INSTALL. INTERIOR DINNING ROOM HAS 6 RECEPTACLES INSTALLED IN CEILING, NEW MINI SPLIT UNIT INSTALLED AIR HANDLE IS IN THE DINNING AREA, CONDENSER IS INSTALLED ON ROOF. REAR OF BUILDING NEW INSTALL OF 4 INCH ABS PIPING FOR WASHING MACHINE. ELECTRICAL SUB PANEL HAS UNAPPROVED WRING METHODS, CONDUCTOR PENETRATING THE EXTERIOR WALL INTO THE INTERIOR IS NOT PROTECTED. CONDUIT REQUIRED. MET WITH OWNER ON SITE, WE DISCUSSED LACK OF A CERTIFICATE OF OCCUPANCY AND THE PROCESS TO OBTAIN PERMITS. OWNER STATED HE HAS NEVER HAD A C OF 0, BUT DID PERMIT THE KITCHEN AND GARAGE REAR OF THE BUILDING. OWNER WAS GIVEN DIRECTION ON APPLYING FOR THE C OF 0 PERMIT AND GIVEN INFORMATION ON THE RE INSPECTION FEES. AT THIS TIME THERE ARE NO LIFE SAFTY ISSUES. WILL RESEARCH RECORDS AT DSD. |