Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/24/2011 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* 1) DWV THRU ROOF WITH WATER DIST. VACUUM PUMP ROOM AND DRY PRODUCE LABELING OK WITH INSULATION |
|
| 05/20/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) INSTALL PER APPROVED PLAN WATER TO WATER HEATER, PIPING REQUIRES TESTING (VAC PUMP ROOM) |
|
| 05/17/2011 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) INWALL DRY PRODUCE LABELING ONLY 2) TEMPORARY CAP ALL SANITARY DRAINS AND VENTS IN THIS OCCUPIED STRUCTURE OR YOU WILL BE ISSUED A REINSPECTION FEE |