Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/05/2011 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :*ADD HANGERS AS REQ'D. OK TO COVER WALLS STOI | |
| 03/30/2011 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) ABS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES, THEN NO MORE THAN 4' BETWEEN HANGERS 2) USE APPROVED HANGERS 3) ISOLATE ABS FROM METAL STUD 4) MID STORY GUIDE FOR VERTICAL PIPE 5) INSULATION PER MANUFACTURERS RECOMMENDATION |