Date Description Inspector Results Comments
04/24/2012 ELECTRIC - PROGRESS Approved
11/18/2011 ELECTRIC - PROGRESS Partial Approval OK H1W, EHLW, P1WB, P1WA, SB1W, EHLW,EPFCC, SB1E, HL1E, EHLE, H1E, HL1E, UPS1E, PCP, CPB, CPA, HCP

1) GROUND LV RACEWAYS ON STAIRS
2) PANEL DIRECTORIES NOT CORRECT
3) PROTECT CONDUCTORS AT DISCONNECTS
4) SWITCH DIVIDERS
5) FINISH REDUCING WASHERS & BOND BUSHINGS @ OSMOSIS EQUIPMENT
11/17/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
11/16/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
1) DISCUSSED SA LIGHTS
11/15/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
11/14/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
1) DISCUSED SCHEDULING
11/10/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
11/10/2011 ELECTRIC - PROGRESS Partial Approval
11/09/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) OK FLOOR BOXES MAIN LOBBY
2) OK BRANCH CIRCUITS PB2, PSBB3, PSPFCC
3) OK EV CHARGER 2 ON B-2 AND 1 ON B-1
4) PROPERLY INSTALL LOCK NUT IN GUTTER ON WEST STAIR WELL AT B-1
5) GUTTER COMING OFF WALL IN FCC ROOM
11/08/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) OK BRANCH CIRCUITS SB3W, UPS3W, H3W, HL3W, UPS3B, SB3E, PSBCP, HSBCP AND HDC
2) OK BOLLARD LIGHTS
ROOF:
1) BOXES UP OVER 12" NEED SUPPORT
2) MISSING COVERS VDV RACEWAYS AND BOXES
3) LOBBY ELEVATOR ROOM NOT WORKING
3RD FLOOR:
1) KO SEAL BOX IN WALL MECHANICAL ROOM WEST
2) LIGHT BOX OPEN ELECTRIC ROOM 3 WEST
3) AT FILTERS/OSMOSIS EQUIPMENT REDUCING WASHER NOT CORRECTLY INSTALLED, NEED BOND BUSHINGS, LABEL DISCONNECTS AND CONTACTORS 110.3 & 250.97
4) MISSING RECEPT COVER
11/07/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) OK LIGHTS NORTH HALL AND ELECTRIC COVES 2ND FLOOR
2) OK LIGHTS IN BUSS DUCT SHAFT ROOM 2ND FLOOR
3) OK 2 EV CHARGERS 2ND FLOOR PARKING
4) OK MAINTENANCE ROOM LIGHTS 3RD FLOOR
5) BOXES MORE THAN 1/4" 314.20 OR 1/8" 314.21 AT LOBBY MARBLE AND IN MECHANICAL ROOMS
INSPECTION FOR #T10CM01795 FROM R. HOLLANDER:
1) PROTECT CONDUCTORS-LARGE JUNCTION BOX 9TH FLOOR
2) FINISH VERTICAL SUPPORTS HSBR FEED 300.19
3) CAP UNUSED RACEWAYS
4) PANEL DIRECTORIES 408.4
NOTE: ELECTRICAL INSPECTIONS AND CORRECTIONS PERFORMED AND APPROVED FOR PERMIT #T10CM01795 WERE DONE WITHIN MY LIMITED ROLE AND TO THE BEST OF MY ABILITY TO ENFORCE CODE COMPLIANCE IN ACCORDANCE WITH CURRENTLY ADOPTED NEC AND ALL APPLICABLE CITY OF TUCSON AMENDMENTS
11/04/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) OK LIGHTING TRANSFORMER VAULT ROOM, LOBBY WALL, WALL PACKS, LIGHTING CONTROLS 4-9, FIRE PUMP ROOM POWER, AUDITORIUM CONTROL PANEL FOR ROOM DIVIDERS AND SERVER DOOR
11/02/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) PROTECT CONDUCTORS-LARGE JUNCTION BOX 9TH FLOOR
2) PANEL DIRECTORIES 408.4
3) MISSING GUTTER COVER SCREWS
11/01/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) VERIFY LISTING FOR LIFT ASSEMBLY IN MAIN FLOOR OPEN AREA
2) PROTECT SEAL TITE FROM SHARP METAL EDGES AT EXHAUST FAN 4TH FLOOR ROOF
3) FINISH ELECTRIC ROOMS
4) BOXES MORE THAN 1/4" AT BARRIER 314.20
10/28/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
10/27/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) MISSING COVERS ON BOXES AND CONDUCTORS (VDV)
2) WHO IS LABELING VFD'S ?
10/26/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) FINISH EXHAUST FANS ROOF OF GARAGE
2) FINISH LIGHTING ROOF OF GARAGE
3) BOXES ON BLDG PATIO OF 4TH FLOOR 314.20
4) FINISH WORK BOXES FIRE PUMP ROOM
10/25/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) OK AUDITORIUM CONTROL PANEL FOR PARTITION WALLS
2) NEED ARC SHIELDS IN CABINETS 314.20
3) CORDS NOT ALLOWED ABOVE CEILING TILES 400.7 & 8
10/19/2011 ELECTRIC - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
10/18/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) FINISH LIGHTING RELAYS
2) NEED ACCESS 5C
3) HANDLE TIE 605.7
4) PANEL DIRECTORIES 408.4
10/17/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
10/13/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
1) GENERAL WALK THRU
10/07/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
10/06/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/30/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/29/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/28/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
09/27/2011 ELECTRIC - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
5TH FLOOR:
1) BOXES CUT ON ROUNDS 314.2
2) PROTECT CONDUCTORS FROM SHARP METAL EDGES
3) FINISH TV RECEPTS AND UTILIZE GROUND SCREW FOR ENCLOSURE
4) SECURE FLOOR BOXES
5) MISSING SWITCHES AND PLATE COVERS FOR ALL DEVICES
6) BOXES MORE THAN 1/4" 314.20
7) UNMADE UP LIGHT BOXES
8) MISSING EXIT SIGNS ROOM 545
9) MISSING JUNCTION BOX COVERS AND KO'S
10) NEED SEPERATION OF DEVICES OVER 300V TO GROUND 404.8
09/26/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/23/2011 ELECTRIC - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
09/22/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) OK PANEL EPFCC
2) OK POWER FOR AHU1.1
09/21/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) OK LIGHTS ROOM FCC
09/20/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) OK BRANCH CIRCUITS P4EA,P4EB,P4WA,P4WB
2) VERIFY CABLE VOLTAGE RATING FOR VDV CABLING IN GUTTER
09/19/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/16/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/15/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/14/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/13/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/12/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/09/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/08/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/07/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
09/06/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/26/2011 ELECTRIC - PROGRESS Partial Approval
08/25/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
08/24/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) SUPPORT VAV CABELING ROOMS 958, 959
2) NEED ACCESS TO JUNCTION BOXES 9TH FLOOR LIDS
1) NEED DISCONNECTING MEANS SCREEN & PARTFLOW MOTORS (AS PLANS) ROOM 241
2) MEET WITH DAN COSTRUST - 604.6 (E) & 348.30 (A) WILL APPLY. SECURE WITHIN 12" PDMI BOXES, 6' W------TO BOXES IN FLOOR SECURING TO LESS IS OK
3) PROTECT VDV CASLING FROM SHARP METAL EDGES.
08/23/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/23/2011 ELECTRIC - PROGRESS Partial Approval MEET WITH GARRETT OF RYAN AND PARSONS ELECTRIC TO DISCUSS 300.11 AND APPLICATION CODE
08/22/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/19/2011 ELECTRIC - PROGRESS Partial Approval
08/18/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/17/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/16/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/15/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/11/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/10/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/09/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/08/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/05/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/04/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/02/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
08/01/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/29/2011 ELECTRIC - PROGRESS Partial Approval LVLS 7,8,9 UNDER FLOOR INTERMEDIATE OK
07/27/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/26/2011 ELECTRIC - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
07/25/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/22/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/21/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/20/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/19/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/18/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :* GENERAL WALK THROUGH
07/14/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/13/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/12/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/11/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/08/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/07/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/06/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
07/01/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/30/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/29/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
06/28/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/27/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/24/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) OK PATIO ON 4TH FLOOR WALLS-REDO
06/23/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
06/22/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
06/21/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/16/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) OK HARD LID 8 WEST
06/15/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/14/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/13/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/08/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/07/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/06/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
OK 9TH FLOOR CONDUIT PLUG + PLAY EAST "D"
1. SUPPORT VDV CABLEING 725.8, 760.24, 770.24, 800.24
2. MEET WITH HECTOR ACC. DISCUSSED WORK BY HIS COMPANY
A. CONTROL PANELS CANNOT USE SHEET METAL THREAD SCREWS 250.8
B. SUPPORT CONDUIT ENTERING EAST SHAFT IN ROOF
C. TIGHTENING HOUSE FITTINGS
06/03/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/02/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/01/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
06/01/2011 ELECTRIC - PROGRESS Partial Approval
05/31/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) WALLS COVERED WITHOUT INSPECTION 635, 637
2) MOVE SUPPORT 629
05/25/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
1) OK SWITCH RELOCATIONS 525, 527, 534, 535, 538, 543, 625, 627, 634, 638, 639 & 643
2) OK PLUG AND PLAY POWER BOXES AND FLEX RUNS 8TH FLOOR EAST OF "D"
3) OK TO 8-10, 18, 19, 20 & 22
4) DOOR TO OPEN 90 DEGREE DISCONNECT TO 7-7
05/23/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
05/20/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
1) NO WORK
05/19/2011 ELECTRIC - PROGRESS Denied IVRS - Inspection :
Work is not complete enough to inspect.| 950*
05/18/2011 ELECTRIC - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
05/17/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
05/16/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
05/13/2011 ELECTRIC - PROGRESS Partial Approval
05/11/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
05/10/2011 ELECTRIC - PROGRESS Partial Approval UNDER FLOOR LEVEL 6 EAST OF LINE D OK
05/09/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
05/06/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
05/05/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
05/04/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
05/03/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
05/02/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :* NO WORK
04/29/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
04/28/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
04/27/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
04/26/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
04/25/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
04/22/2011 ELECTRIC - PROGRESS Partial Approval DATA AND RIGID POWER RUNS EAST OF LINE D UNDER FLOOR OK. POWER LINES FOR "PLUG & PLAY" NOT INSTALLED. MAKEUP STILL MISSING.
04/21/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
04/20/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
WAITING ON ANSWERS FOR COLD CATHODE LIGHTING
04/19/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
04/18/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
04/14/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
04/13/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
04/12/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
04/11/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
04/08/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
04/07/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
5TH FLOOR:
1) FILL UNUSED OPENINGS IN BOXES
2) WAITING FOR FLOOR SUPPORT LEGS TO SUPPORT VDV CABLING PER 725.8 AND 800.24
04/06/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
04/05/2011 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
04/04/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
04/01/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
03/31/2011 ELECTRIC - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) NO WORK PROGRESS
2) TIGHTEN LOOSE FITTINGS
3) NO MORE THAN 360 DEGREE IN CONDUIT RUNS
03/30/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
03/29/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
03/25/2011 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*