Permit: T10CM03478

Parcel: 11717023E


Addresses:

88 E BROADWAY BL

Inspection Status: Approved

Inspection History: ELECTRIC - INTERMEDIATE

Date Description Inspector Results Comments
11/21/2011 ELECTRIC - INTERMEDIATE Approved
11/03/2011 ELECTRIC - INTERMEDIATE Partial Approval FOR LEVELS B1-B3:
VFD'S OK.
NEED ACCESS PANEL LEVEL B1 AT ELEVATOR
NEED TO COMPLETE LIGHTS AT MECH ROOMS FOR FANS
NEED TO COMPLETE CAR CHARGERS
10/19/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
10/19/2011 ELECTRIC - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) NO MORE THAN 360 DEGREE IN CONDUIT RUNS-VDV CABLING
2) FINISH CONTROL WIRING-VDV
3) LOOSE FITTINGS VDV RACEWAYS
10/07/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) CHECK FIXTURES FOR DISCONNECTING MEANS 410.63 (G)
2) MICROPHONE CABLE LAYING ON GRID 725.8
3) EV CHARGER TO BE INSTALLED PER 625.13 & 625.23
10/06/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
09/30/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) DISCUSSED ELECTRICAL INSTALLATION METHODS
09/29/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) BOXES IN COMM ROOMS FOR POWER 314.2
09/23/2011 ELECTRIC - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) VERIFY ORANGE ENT(INTER DUCT) LISTING 362.6
09/22/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
09/19/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK H1E MAIN LUGS
2) OK CONDUITS ON NORTH RACK AT SERVICE DRIVE
09/16/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK RECESSED CANS ROOM 242
2) VDV CABLES NOT FINISHED
09/13/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) USE APPROVED STRAPS FOR M/C CABLE
2) SECURE M/C CABLE 12" + 6' INTERVALS
3) NEED JUNCTION BOX ACCESS
09/12/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) CANNOT USE CONNECTORS ON ROUNDS IN BOXES 314.2
2) VERIFY BOX FILL ON 4 SQUARE, RWG AND 4/0 PANCAKES
3) PLEASE VERIFY TYPE OF FIRE ALARM CABLES TO APPLY
4) APPLICABLE CODES
09/09/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
09/08/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) GENERAL WALK THRU AND ANSWERED QUESTIONS
2) SPOKE WITH CLIMATEC ABOUT 10' SUPPORTS ON DVDE CABLING PER ENGINEER OF RECORD
09/07/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
3RD FLOOR:
1) NEED JUNCTION BOX ACCESS
2) NO MORE THAN 360 DEGREE IN CONDUIT RUNS (POWER AND DATA)
3) PROTECT VDV CABLES FROM SHARP METAL EDGES
09/06/2011 ELECTRIC - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
9TH FLOOR:
1) OK 2 X 4 LAY IN'S OFFICES 9TH FLOOR
2) OK 9TH FLOOR PATIO
3) NEED ACCESS TO JUNCTION BOXES
4) SECURE M/C CABLES WITHIN 12" OF BOXES
5) MISSING JUNCTION BOX AND ? COVERS
6) PROTECT VDV FROM SHARP METAL EDGES
7) SUPPOR VDV CABLES 725.24 AND 300.11
08/26/2011 ELECTRIC - INTERMEDIATE Partial Approval
08/25/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
08/24/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK CEILING FANS & POWER ROOM 959, 958, 920
OK ABOVE CEILING 241 EXCEPT AS NOTED.
08/23/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
08/22/2011 ELECTRIC - INTERMEDIATE Partial Approval OK LIGHTING IN ADITORIUM 241
OK ELEVATOR LOBBY & HALL 301
OK CANS SOFFIT 372
OK PDU - A1a & b, PDU - B2a & b
SUPPORT VDV CABLEING AUDITORIUM (241) PER 300.11
SEAL UNUSED CONDUIT OPENING UNDER SERVER ROOM FLOOR
08/19/2011 ELECTRIC - INTERMEDIATE Partial Approval OK MECHANICAL ROOMS FOR CONTROL WORK
(ACC) BOTH EAST & WEST 5TH FLOOR THRU 9TH FLOOR
DID GENERAL WALK THRU FOR COMM ROOMS
08/18/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK HARD LID SOUTH OF ELEVATOR LOBBY 7TH FLOOR
2) OPEN UP FLOOR ON 5TH FLOOR TO INSPECT PLUG, PLAY WIRING AND EQUIPMENT
3) SHEET METAL THREAD SCREWS NOT ALLOWED FOR GROUNDING IN A/C CONTROL CABINETS 250.8
4) ON 5TH FLOOR WE HAVE OPEN JUNCTION BOXES ABOVE CEILING
5) OK WALLS ROOMS 246-250
2) OK P7EA,P7EB,UPS7E,SB7E,H7E,P7WA,P7WB,UPS7W,SB7W
3) MEET WITH DAN FOR PLUG AND PLAY-INSTRUCTED WHAT TO OPEN FOR TOMORROW ON 5TH FLOOR
08/17/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK SB3E,TS83E,UPSB3DB,TOPSBRDB,UPSB1DB,TUPSBLDB,UPSA1DB,TUPSA1DB,UPSA2DB,TUPSA2DB,UPSA,UPSB
2) SECURE XFMR P3EA,UPSA BY PASS,UPSA,UPSB BY PASS
3) VERIFY LISTING FOR ORANGE EMT AND PLENIUM RATING
08/16/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK CANN HALLS 925 & 935, OK CANS SOFFITS 925 AND OK WALLS 369-372 HALL 366
2) NOTE: NO MORE THAN 360 DEGREE IN RUNS, JUNCTION BOX ACCESS AND CONDUIT SUPPORTS WITHIN 3'
3) FIXTURES WITH DBL END TUBES AND BALLAST 410.73 (G)
4) SWITCH BOARD DSCPA 408.3
08/15/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK UPS-A-ODD, UPS A & B WITH BATTERY COMPARTMENTS, P3EA, HL3E, UPS3E, H3E, TUPS3E, BUSS PLUGS H3E, HL3E
2) OK WALLS WEST OF COLUMN 'D' 7TH FLOOR
3) FINISH BOTLING XFMR TP3E
4) FINISH XFMR'S GROUNDING
5) SUPPORT SWITCH 90 DEGREES ON 7
08/11/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK WALLS 256-267 AND 280
2) OK PANEL PSBCP, TSBCP2, HDC, ATS-A, ? & C AND STS
3) UPS-B-ODB
08/10/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK WALLS WEST OF COLUMN "D" 8TH FLOOR
08/09/2011 ELECTRIC - INTERMEDIATE Partial Approval
08/08/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) FINISH WALLS 8TH FLOOR WEST OF "D"-STRAPPINJG AND KO'S SEALS
2) SUPPORT VDV CABLING ABOVE HARD LID HALL NORTH OF CORE AND ELEVATOR LOBBY 725.8
08/05/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK ELEVATOR LOBBY LID 9TH FLOOR
2) OK ROOM WALLS 360 AND 377
3) BROKEN SECURITY FLEX 9TH FLOOR LOBBY
4) FINISH SWITCHES 2ND FLOOR WALLS
08/04/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
08/04/2011 ELECTRIC - INTERMEDIATE Partial Approval WALLS ON 3 OK
08/02/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK ELEVATOR LOBBIES 3-9 EXCEPT LIGHTING CONTROLS
2) OK CLOUD ELEVATOR LOBBY 8TH FLOOR
3) NO MORE THAN 360 DEGREE IN CONDUIT RUNS
4) BROKEN JUNCTION BOX
08/01/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) ON 9 & 10 LOOSE FITTINGS AND STRAPS
2) BOND JUNCTION BOX
3) FINISH ELEVATOR LOBBIES
4) FINISH WALLS ON 9TH FLOOR
07/29/2011 ELECTRIC - INTERMEDIATE Partial Approval LEVEL 9 TI WALLS OK
07/27/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK CONNECTIONS FOR 2 LIEBERT UNITS
2) OK CONDUIT & BOXES 2ND FLOOR EAST OF 'D' SOUTH OF CORE AND ROOMS 254 & 255
3) FINISH PLUG AND PLAY WIRING & BOXES 2ND FLOOR
07/26/2011 ELECTRIC - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
ELEVATOR LOBBIES:
1) TIGHTEN LOOSE FITTINGS
2) PROPERLY SUPPORT CONDUITS
3) BROKEN FLEX 8TH FLOOR (FIRE ALARM)
07/25/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) FINSIH ROOM 534
2) NEED BANG PLATES 4TH FLOOR
8TH FLOOR:
1) OK FLOOR WEST OF COLUMN D
2) OK TV 1-4, 25-28
07/22/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) GENERAL WALK THRU
07/21/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK 6 CANS WEST END 241
2) OK CANS HALL IN 240 COLUMN B.5 TO E
3) OK WALLS ROOM 923
4) OK WALL 240 AGAINST CORE
07/20/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK WALL WEST OF COLUMN 'D' 4TH AND 5TH FLOORS
2) FILL UNUSED OPENING JUNCTION BOX ON 5TH FLOOR
3) FINISH BANG PLATES ON 4TH FLOOR
07/19/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) FINISH WALL WEST OF 'D' ON 5TH FLOOR
2) PROTECT M/C CABLE BASE PLATES 4TH FLOOR WALLS WEST OF 'D'
07/18/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
07/14/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :* PROTECT M/C CABLE AT BASE PLATES
07/13/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK WALL EAST COLUMN "D" EXCEPT ROOMS 934,935,936,937,938,939 AND 940
07/12/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) SECURE RACEWAYS TO FLOOR UPS ROOM
2) OK TO USE FLEX CONDUIT TO TRANSITION DUE TO SPACE
07/11/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) FINISH WALL 9TH FLOOR
07/08/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) FINISH WALLS 9TH FLOOR
2) PROTECT M/C CABLE AND FLEX CABLE FROM CORROSION 300.7
07/07/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK CANS HALL CEILING ON 4TH FLOOR WEST
07/06/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK FLOOR WEST OF COLUMN 'D' FOR CONDUIT, BOXES AND TV'S 1-4, 25-28 AND RF'S 1 & 2
07/01/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK 4 ON FLOOR WEST OF COLUMN 'D'
2) OK TV'S 1-4, 23-26 AND RF'S 1 & 2
3) OK PLUG AND PLAY ON 4TH FLOOR WEST 'D'
4) OK HARD LID 481
5) FINISH WALLS-PARTIAL ROCK WITHOUT INSPECTIONS
06/30/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK WALLS EAST COLUMN 'D' 4TH FLOOR
06/29/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
06/28/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK SOFFIT 340,344,346,349 FOR 4TH FLOOR PATIO
06/27/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1 OK HARD LIDS 501,601,701 & 801 EXCEPT AS NOTED
2) OK EAST WALL 852 AND 821
3) MISSING EM LIGHTS AT 501
06/24/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
06/23/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
06/22/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) GENERAL WALK THRU AND ANSWER QUESTIONS
06/21/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) RF3-3,4
2) OK LID 446 OK TV 3-1,2,3,4,5,,7,9,12,13,14,15,16,19,25 AND 26
3) OK WALLS 259,262,254 AND 255 REDO
4) AFTER CORRECTIONS OK FLOOR BOXES,CONDUITS NORTH 1/2 AND EAST END OF 3RD FLOOR
5) PROTECT FLEX AND M/C CABLES 259 AND 262 ON CORE WALL
6) FINISH ROOM 241-AUDITORIUM
06/16/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
06/15/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK 746,764 AND WEST HALL IN FRONT OF BATHROOM LIDS
2) OK 846, 864 HARD LIDS, OK 8TH FLOOR WALLS EAST OF COLUMN D
06/14/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK 9TH FLOOR BOXES AND CONDUIT, PLUG AND PLAY & TV'S MAKE UP 8-22,24-27 AND 32-34
2) SECURE M/C IN WALLS
3) MISSING M/C TO DATA BOX RECEPT
06/13/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK 4TH FLOOR CONDUIT AND BOXES, PLUG AND PLAY AND TV'S MAKE UP 5-22, 27, 28, EAST OF COLUMN D
2) OK HARD LID 546, 646 AND 764
3) NEED JUNCTION BOX ACCESS
4) STRAP FLEX TO 4.27
06/10/2011 ELECTRIC - INTERMEDIATE Partial Approval DISC AT BUS-DUCT TO HE PANEL LEVELS 5-9 OK
HE TO VDF AND AIR HANDLERS OK LEVELS 5-9
06/08/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK HALL 615 CANS AND CONDUIT
2) NOTE: JUNCTION BOX ACCESSIBILITY
06/07/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK SEPERATION FOR EM LIGHTING AND NORMAL LIGHTING AT HALL
06/06/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK 9TH FLOOR CONDUIT PLUG + PLAY EAST "D"
1. SUPPORT VDV CABLEING 725.8, 760.24, 770.24, 800.24
2. MEET WITH HECTOR ACC. DISCUSSED WORK BY HIS COMPANY
A. CONTROL PANELS CANNOT USE SHEET METAL THREAD SCREWS 250.8
B. SUPPORT CONDUIT ENTERING EAST SHAFT IN ROOF
C. TIGHTENING HOUSE FITTINGS
06/03/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK ELECTRIC IN WALLS EAST OF COLUMN D
2) FINISH T STAT CONDUITS IN WALLS 7TH FLOOR
06/02/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
6TH FLOOR:
1) SEPERATE EM LIGHTING FROM NORMAL LIGHTING IN RACEWAYS
2) NEED JUNCTION BOX ACCESS ABOVE HARD LIDS
5TH FLOOR:
1) NEED JUNCTION BOX ACCESS ABOVE HAD LIDS
2) OK CANS HALL 554
3) VDV CABLING UNDER FLOOR 725.8, 760.24, 770.24 & 800.24
06/01/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK TV-6,7,8,9,11,12,13,14,15,16,17,21,23,24,29 AND 30 8TH FLOOR
2) 9TH FLOOR: NO MORE THAN 360 DEGREE IN CONDUIT RUNS (CEILING)
2) FLEX FOR PLUG AND PLAY BROKEN IN WEST ELECTRIC ROOM
ROOF:
1) TIGHTEN LOOSE FITTINGS
2) 629 COVERED WITHOUT INSPECTION
05/31/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
05/26/2011 ELECTRIC - INTERMEDIATE Partial Approval 1) SES-A BRKR HGA NEED TO SEE TORQUED IN.

2) PNL HGA OK TO ENERGIZE WITH PROPER LOCK-OUT PROCEDURES. PNL MPOP OK TO ENERGIZE TO DOMESTIC WATER PUMP CONTROLLER.
05/25/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
05/23/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) PLEASE VERIFY PLENIUM RATING FOR WHITE EMT
2) TIGHTEN LOOSE FITTING AH 1,2,3
05/20/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
05/19/2011 ELECTRIC - INTERMEDIATE Denied IVRS - Inspection :
Work is not complete enough to inspect.| 950*
1) NO WORK PROGRESS 6TH FLOOR-WALLS MISSING AND DATA AS PREVIOUS INSPECTIONS
05/18/2011 ELECTRIC - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) DATA RUNS PER PLANS AND 725.8 NEED TO BE SUPPORTED
2) DATA CONDUITS LOOSE FITTINGS, SUPPORT WITHIN 3' OF FLOOR STUDS
3) FINISH WALLS 629, 636 AND 637
05/17/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK WALLS EXTERIOR 353, 354 AND 349
2) FINISH 6TH FLOOR
05/16/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) MISSING PLUG AND PLAY UNDER FLOOR AT 5TH FLOOR
2) OK UNDER FLOOR 612
05/13/2011 ELECTRIC - INTERMEDIATE Partial Approval
05/11/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) PROTECT M/C CABLE AT FLOOR SMALL BATHROOM #8
2) PROTECT CONDUITS FOR VDV CABLING FROM SHARP METAL EDGES #5
05/10/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) SUPPORT DATA AND SIGNAL SENDING CABLES, VDV 725.8, 770.24, 800.24 AND AS MARKED ON AV PLANS
2) SUPPORT CONDUITS WITHIN 3' OF FLOOR FOR STUBS DOWN
05/09/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
5TH FLOOR:
1) FINISH SUPPORTING CONDUITS GOING DOWN
05/06/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
05/05/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) FINISH STUBS DOWN TO WITHIN 8" OF FLOOR TO CHECK FITTINGS AND SUPPORT
05/04/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :* OK EAST SIDE 211
05/03/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK WALLS ON CORE 206, 207, 208, 211 & 202
OK WALLS SOUTH SIDE EXTERIOR
OK WALLS 254, 255, 241, 362-366
OK SOUTH WALL 364, 370
04/29/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/28/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/27/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
04/26/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/25/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/21/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK BOXES AND CONDUITS 4TH LEVEL WITH WIFI AT ENTRANCE
04/20/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
WAITING ON ANSWERS FOR COLD CATHODE LIGHTING
04/19/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/18/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
04/14/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/12/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/11/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
04/08/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/07/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/05/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
04/04/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
04/01/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK CORE WALLS
2) NO PROGRESS ON 4 TERRANCE
03/31/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
03/31/2011 ELECTRIC - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
03/30/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) NO MORE THAN 360 DEGREE IN CONDUIT RUNS
2) OK AUDITORIUM 241 WALLS
3) OK 3RD FLOOR NORTH WALL AS MARKED
03/29/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK RUNS FOR TI AT BATHROOM WALLS-CONDUIT UP WALLS
03/25/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK EXTERIOR WALLS
2) FINISH 511,502,513,STAIRWELL AND PHYSICAL PROTECTION OF M/C
03/21/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) PROTECT M/C IN STUDS
03/17/2011 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) OK 3RD FLOOR AUDITORIUM AS MARKED
03/15/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
03/09/2011 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1) TODD STATE NOT READY FOR INSPECTIONS