Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2012 | BUILDING - FINAL | Approved | ||
| 11/21/2011 | BUILDING - FINAL | Partial Approval | ||
| 11/16/2011 | BUILDING - FINAL | Partial Approval | ||
| 11/10/2011 | BUILDING - FINAL | Partial Approval | WALKED 1-4 | |
| 11/01/2011 | BUILDING - FINAL | Partial Approval | LEVELS 5-R00F FINAL | |
| 10/27/2011 | BUILDING - FINAL | Partial Approval | LEVEL 8 CORRECTIONS FOLLOW: 1) firestop all 4" pipe chases and penetrations in comm rooms 2) light fixture missing west wall (8087) 3) outlet covers missing west hall 4) water heater in west mechanical now powered (connect wiring) 5) firestop breakroom sink penetration into shaft membrane (west) 6) complete plumbing to ice machine wastes 7) secure plug & play outlets 8) finish cable rails stair 6 9) outlet covers missing 8076 10) comm runs incomplete 837,849,842,831, etc 11) need access to mech 8E and elec rooms; all equipment to be properly labeled and electrical panel schedules to be made up. |
|
| 10/27/2011 | BUILDING - FINAL | Partial Approval | LEVEL 7 CORRECTIONS FOLLOW: 1) Occupancy sensors and comm runs incomplete in several areas. 2) firestop unused chases in comm rooms 3) secure plug & plays 4) label all mechanical equipment 5) cover outlet over door M7E 6) need access to elec rooms...all panel schedules to be in place 7) install drains for ice machines 8) door at lactation room may not exceed 5#'s force to open 9) outlet covers needed 7076, 752, etc (comm boxes) 10) finish cable rails at stair 6 11) flash rings needed a microwave plug receps (west break room lower cabinet 12) wire water heaters mech 7W...also tprv must terminate above flood rim of drain pan 13) fixture missing payroll 7085 |
|
| 10/25/2011 | BUILDING - FINAL | Partial Approval | For roof and all floors: 1) Elevator Certificate 2) Air balance reports 3) Mechanical system commissioning 4) Special inspection certificate for structural 5) Potable water steriliation report 6) Lightning supression report R1) Seal conduits and chases penetrating roof R2) Label all mechanical equipement R3) support condensate line north side of elevator penthouse R4) complete all work in electric room, including labeling and panel schedules R5) Support conduit & finish wiring for mini-split condensor R6) Provide permanent cap for grease duct R7) Secure conduit south side of penthouse R8) check sprinkler pipe support at top of stair 1 |
|
| 10/25/2011 | BUILDING - FINAL | Partial Approval | For 9th floor: Elevator Certificate Air balance reports Mechanical system commissioning Special inspection certificate for structural Potable water steriliation report Lightning supression report and 1) firestop conduit openings in comm rooms 2) mens HC water closet to be 16'--18" from side wall (not 18.5") 3) finish electric runs to roof 4) permanent panel schedules and labels needed in electric rooms 5) complete electrical fixturing in board room 6) complete AV rooms, and clarify if you want separation from mech room to main AV room 7) provide permanent labels on all mechanical equipment 8) connect water heater in west mechanical 9) plug & play systems to be properly secured to floor 10) provide flash rings at all microwave plug receptacles in cabinets 11) hang all doors 12) complete zone 2 wiring in room 955 13) check for leak that damaged ceiling tiles in room 954 14) finish comm links to deck 15) finish cable rails at stair 6 16) fire stop at alarm strobe outlet just inside stair 1. |
|
| 10/24/2011 | BUILDING - FINAL | Partial Approval |