Permit: T10CM03355

Parcel: 12713078B

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T10CM03355

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
04/27/2011 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :*
03/21/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
03/16/2011 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
1) GW TO TIE IN OK
2) PIPE INSULATION REQUIRES ADHESIVE AT SEAMS AND JOINTS
03/15/2011 PLUMBING - ROUGH, SOIL Partial Approval 1. INSTALLED PER REDLINES. PROVIDE AN APPROVED PLAN REVISION FOR ALL CHANGES MADE. INSTALL CARRIER AND PIPE INSULATION AS SPECIFIED. OK TO COVER TRS SUBJECT TO APPROVED PLAN AT A LATER DATE. ONE HUNDRED POUND TEST ON DOMESTIC WATER.
03/14/2011 PLUMBING - ROUGH, SOIL Partial Approval 4" GW FROM INLET PIPE AT INTERCEPTOR BACK INTO STRUCTURE TO ALL FIXTURES SHOWN THRU ROOF WATER TEST OK WITH TWO INCH STUBBED BACK INTO THE BLDG. FOUR INCH SANITARY FROM FIFTEEN FEET FROM EXTERIOR BACK THROUGH TO ALL FIXTURES WATER TEST THROUGH THE ROOF OK, PENDING REVISED APPROVED PLANS FOR CHANGES TO SIZING, ROUTING, AND LOCATIONS. BASEMENT ROUGH TO BE SEEN WITH INTERCEPTOR DISCHARGE BACK TO SANITARY.
02/24/2011 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*
1) MIKE WITH CAYLOR AND RAFAEL WITH MTN. STATES