Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2011 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 05/12/2011 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) PROVIDE MINIMUM 36" CLEARANCE AT SERVICE DISCONNECTS 2) PROVIDE GAUGE FOR GAS PRESSURE TEST 3) SERVICE PANEL OK |
|
| 03/03/2011 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE MINIMUM 2" R8 DUCT LINER IN ALL EXPOSED DUCT ON THE ROOF FOR BOTH UNITS 2) PROVIDE THE REQUIRED GFI SERVICE RECEPT ON ROOF 3) REMOVE THE CONDENSATE TRAP FROM THE 4 TON UNIT AS PER MANUFACTURERS INSTRUCTIONS. SUPPORT CONDENSATE DRAINS EVERY 4'. PAINT EXPOSED PVC WITH LATEX PAINT 4) PROVIDE THE REQUIRED STRUCTURAL DRAWING FROM THE CITY OF TUCSON FOR NEW A/C UNITS ON THE ROOF 5) MARK UNIT DATA PLATE ON 2 TON UNIT FOR PROPER HEAT STRIPS AND FUSE ACCORDINGLY |