Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/24/2010 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 11/23/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) PROVIDE WEATHER TIGHT FLASHING FOR 4 X 4'S ON ROOF AT TILE LEVEL 2) INSULATION ON ROOF PIPING FOR WATER SYSTEM TO BE PROPERLY SEALED AT SEAMS AND JOINTS AND BE PROTECTED FROM UV EXPOSURE PER MANUFACTURE 3) FOR OWNERS PROTECTION PROVIDE HOSE CAPS OR REMOVE HANDLES ON SOLAR PANEL DRAIN VALVES TO PREVENT ACCIDENTAL SCALDING 4) MANUFACTURE REQUIRES 25 AMP MAX BREAKER FOR CIRCUIT |
|
| 11/17/2010 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |