Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: T10CM03210

Parcel: 11504498A


Addresses:

850 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
11/29/2010 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
11/23/2010 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
1
11/22/2010 PLUMBING - GAS PRESSURE TEST Not ready for Inspection IVRS - Inspection :*
1) EXPOSE OVERHEAD GAS PIPING FOR INSPECTION. ALL PIPING IS TO BE SUPPORTED PER TABLE 3-2 2006 UPC
2) EACH WATER SUPPLIED APPLIANCE TO HAVE BACKFLOW PROTECTION
3) INDIRECT WASTE PIPING
4) 2 COMPS OF 3 COMP SINK TO BE DIRECTLY WASTED, GRATES & STRAINERS, APPROVED MATERIALS AND BACKFLOW CERTS
5) REQUIRE A TEST ON GAS SYSTEM-DO NOT TEST THRU ANSUL VALVE