Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
Permit Number - T10CM03210
Inspection Description - PLUMBING - GAS PRESSURE TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/29/2010 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
11/23/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1 |
|
11/22/2010 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1) EXPOSE OVERHEAD GAS PIPING FOR INSPECTION. ALL PIPING IS TO BE SUPPORTED PER TABLE 3-2 2006 UPC 2) EACH WATER SUPPLIED APPLIANCE TO HAVE BACKFLOW PROTECTION 3) INDIRECT WASTE PIPING 4) 2 COMPS OF 3 COMP SINK TO BE DIRECTLY WASTED, GRATES & STRAINERS, APPROVED MATERIALS AND BACKFLOW CERTS 5) REQUIRE A TEST ON GAS SYSTEM-DO NOT TEST THRU ANSUL VALVE |